Concrete shall be supplied towards the pile by transit mixers and placed by the entire size tremie pipe approach. The withdrawn tube is fitted which has a Exclusive flat iron shoe and Again driven in the exact same gap. The charge of concrete down below gets expanded to nearly double https://zanedxbvp.blogspothub.com/31798195/getting-my-cast-in-situ-piles-in-bangladesh-to-work