Penmann has completed a tailored HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a fully engineered ventilation and climate control system designed to satisfy demanding hygiene and production criteria. The scope included the complete lifecycle delivery of cutting-edge HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. https://listingbookmarks.com/story20698319/penmann-finalises-comprehensive-hvac-refurbishment-for-nutricia-s-production-facility-in-liverpool-supporting-fsi-phase-1-2